Micro store
4 / 5
dry type power transformer three phase step up transformer 220v 380v 400v to 10kv 35kv 100 150 400 500 630 750 1000 1250 kva
reviews
Item specifics
- Place of Origin:
- Shandong, China
- Brand Name:
- Jinshida
- Model Number:
- SCB11-30~1600/,S11-30~1600/,S11-30~20000/35
- Usage:
- Power
- Phase:
- Three
- Coil Structure:
- TOROIDAL
- Coil Number:
- AUTOTRANSFORMER
- Input Voltage:
- 220V, 110V, 240V, 380V, 400V, 440V
- Product name:
- Three Phase Transformer
- Rated capacity:
- 400kVA
- Standard:
- ISO9001: 2008
- Rated voltage:
- 0.4 KV
- Warranty:
- 24 Months
- Secondary voltage:
- 10 KV
- Cooling Method:
- ONAN
- Working frequency:
- 50 / 60 Hz
- Primary voltage:
- 400 V
- onput Voltageto:
- 10KV, 13.8KV, 20KV, 30KV, 35KV
Description


Product Paramenters
10Rated Power (kVA) | High Voltage (kv) | Low Voltage (kv) | Connection symbol | No-load loss(W) | On-load loss(W) | No load current (%) |
400KVA | 10KV 11KV 20KV 35KV | 0.4 | Yyn0 | 980 | 3990 | 1.2 |
500KVA | 1160 | 4880 | 1.2 | |||
630KVA | 1340 | 5880 | 1 | |||
800KVA | 1520 | 6960 | 1 | |||
1000KVA | 1770 | 8130 | 1 | |||
1250KAV | 2090 | 9690 | 1 | |||
1600KVA | 2450 | 11730 | 1 | |||
2000KVA | 3050 | 15960 | 0.8 | |||
2500KAV | 3600 | 18890 | 0.8 |
Mobile phone / wechat all have this number
what's app:008617662058353
Sales Record

Products Description

Details Images


Product Photograph


Company Profile

Certifications

Packaging and delivery


1. Are you trading company?
No. We’re transformer manufacturer with production base of 20,000 ㎡ and we’re located in Shandong province,it's close to the port.
2. After sales service-Response within 24H
We have dedicated after sales service team, any support regarding installation, on site commissioning, maintenance, please just contact us and we will response within 24H.
For any concern or complaint, please send your advice to mail: sdjinshida@gmail.com
3. Quality guarantee 15+ testing procedure before delivery
We have complete and professional quality control system, and for each unique product before delivery, it will go through several strict test and make sure the required performance and stability of the machine.
4. On site/on line Production and Quality production supervision.
Customer own the product supervision right, and for each important process during the manufacturing and testing (or to be defined by customer’s request), by means of on site check or on line check. Meanwhile, we will also provide traceable records for check.
5. Packing&Transportation
Wooden pallet packing or or to be defined by customer.
6. Leading time
For standard product, approximately 15 working days before delivery.
For customized product, approximately 20~30 working days before delivery.
Order quantity/customization requirements can also affect the leading time.
7. Warranty/ Payment terms
2 years of warranty at least.
For the first order we normally accept T/T, 30%+70%. Regular customer payment terms to be negotiated by both parties.
8.Difference Between Power Transformer and Distribution Transformer
(1)Transformer Size / Insulation Level:Power transformers have a higher insulation level than distribution transformers
(2)Iron Losses and Copper Losses:Power transformers lose energy as heat due to eddy current losses in their steel laminations and hysteresis losses in the core material. Distribution transformers don’t have any iron parts, so they have lower iron losses than power transformers. They also lose energy due to hysteresis losses in the core material.
(3)Maximum Efficiency:Power transformers are generally less efficient than distribution transformers because of their larger size and heavier currents.
9.Dry Type Transformer VS Oil Filled Transformer
(1)Dry-Type Transformer:A dry-type transformer is a motionless piece of equipment that uses environmentally acceptable temperature insulation systems. They are also known as “cast resin type transformers.”
(2)Oil-Filled Transformer:Oil-filled or oil-immersed transformers are voltage conversion devices that use oil to keep the transformer cool. This type of transformer structure is mounted in a welded steel oil tank filled with oil.
(3)Summarize:Based on our dry-type transformer vs. oil-filled transformer analysis, oil-filled transformers appear to be a better alternative in terms of energy-saving, cost-saving, and recyclability. Dry-type transformers, on the other hand, are safer for interior operations.
10.Single Phase VS Three Phase
(1)The alternating current power supply can be classified into single-phase(1-phase) and three-phase(3-phase). In general, a single-phase power is used where electricity requirement is low. In short, it is for running small equipment. The three-phase power carries a heavy load and can run large machinery in factories.
(2)When it comes to single phase vs three phase, the main difference is that the former is used for household electricity requirements and the latter one is used to run heavy machinery. This article discusses the differences between them so that you can know what three phase power is and understand how they work.
11.Guide to Oil-Filled Transformers Maintenance
Routine transformer maintenance isn’t a one-time thing. It would be best if you drafted individual daily, weekly, monthly, and yearly maintenance strategies. Additionally, you will have to specify different transformer maintenance elements for each period.
12.Guide to Dry Type Transformer Maintenance
(1)Check transformer dust accumulation and clean up.
(2)Transformer turns ratio experiment and dielectric absorption experiment were carried out.